Sewer Construction Specifications


The following list of documents (in Adobe Acrobat format) can be viewed, downloaded, and printed. These are the individual "Service Connection Policy" document, and the "Standard Specifications for The Construction of an Extension to the Sanitary Sewer System", as well as a combined document containing all sections.

Periodically changes are made to these documents, either due to errors discovered, unclear phrasing, misspelled words, or whatever else is brought to our attention that we determine is necessary to correct. The essential specifications in general will not change without UAJA Board review and approval. If you would like to be notified when changes are made to any of these documents, send an email to us by clicking here and specify in the message that you would like to be on the Sewer Specifications Update List.


Once any documents below are modified they will be followed by the date that the revision was made in
red.

Click on any of the following titles to view the section that interests you:

 
  Service Connection Policy AND Standard Specifications (combined document - all sections)
 
  Cover
  Table Of Contents
  00 70 00     Service Connection Policy
  00 70 00     Development Review Process Table
  01 10 00     Summary Of Work
  01 31 00     Project Management and Coordination
  01 32 00     Construction Progress Documentation
  01 33 00     Submittals
  01 40 00     Quality Control
  01 41 26     Permit Requirements
  01 50 00     Construction Facilities and Temporary Controls
  01 77 00     Closeout Procedures
  01 78 23     Operation and Maintenance Data
  01 78 39     Project Record Documents
  03 30 00     Cast-in-Place Concrete
  03 40 00     Precast Concrete     07/18/2017
  08 31 13     Access Hatches and Frames
  09 91 00     Painting
  26 05 19     Electrical Power Conductors and Cables
  26 05 20     Cables for Instrumentation
  26 05 26     Grounding and Bonding for Electrical Systems
  26 05 29     Hangers and Supports for Electrical Systems
  26 05 33     Raceways and Boxes for Electrical Systems
  26 05 53     Identification for Electrical Systems
  26 05 73     Short-Circuit Coordination Arc Flash Study
  31 10 00     Clearing and Grubbing
  31 23 00     Excavation and Fill
  31 23 19     Dewatering
  31 23 33     Trenching, Backfilling and Compacting
  31 40 00     Shoring and Underpinning
  32 12 00     Flexible Paving and Surfacing
  32 92 00     Turf and Grasses
  32 93 00     Plants
  33 01 30     Operation and Maintenance of Sewer Utilities
  33 05 23     Trenchless Utility Installation
  33 08 10     Reclaimed Waterline Testing
  33 11 00     Reclaimed Water Utility Distribution Piping
  33 12 00     Reclaimed Water Utility Distribution Equipment
  33 13 00     Disinfection of Reclaimed Water Utility Distribution
  33 31 00     Sanitary Utility Sewerage Piping and Accessories
  33 32 16     Packaged Grinder Pump Units
  33 39 13     Sanitary Utility Manholes, Frames, and Covers    07/18/2017
  40 61 13     Process Control System General Provisions
  40 61 96     Process Control Descriptions
  40 63 00     Control System Equipment
  40 68 00     Control System Integration
  40 72 00     Instrumentation for Process Systems - Level Measurement
  43 25 00     Submersible Liquid Pumps
  Appendix A - List of Manufacturers    07/18/2017
  Appendix B - Sanitary Sewer Details
  Appendix C - Pump Station Details
  Appendix D - Reclaimed Water Details
  Appendix E - Checklist for Design and As Built Drawings
  Appendix F - Specifications for Electronic Submission
            GIS Documents Bundle  (all files necessary for Electronic Submission)   01-28-16
  Appendix G - Sewer Extension Agreement (DEP Permit Required)
  Appendix H - Sewer Service Agreement (No DEP Permit Required)
   
  Rate Resolution     12-01-16
  Discharge Questionnaire    10-11-12
  Standard Easement Form     04-27-06
  Water Quality Management Permit Application